Most of a cyber-resilience file can be written by a lawyer. The parts that get rejected are the ones that need someone to read the boot chain: is the update actually signed, does the device refuse an old image, can a key be extracted from flash, and can you prove it three years later when a component you shipped has a CVE.
The reporting duty under Article 14 has applied since 11 September 2026: an actively exploited vulnerability has to reach ENISA and the national CSIRT within 24 hours, with a notification at 72 hours and a final report at 14 days. That clock does not start in a policy document — it starts with someone being able to answer, within an hour, whether a given CVE affects a given release. If the answer requires rebuilding an image to find out, the deadline is already gone.
The same gap shows up earlier, in the radio equipment route: EN 18031 has applied since 1 August 2025, and its clauses on secure updates, access control, key storage and network monitoring are firmware clauses. Products that claim them without a signed update path and a protected key store do not survive a technical review.
Click a tile for the detail — scope, artefacts and the method behind each one.
Ed25519 or RSA-3072 image signing, verified in the bootloader before execution; signed manifest over every partition; A/B slots with atomic switch and rollback; anti-rollback counter in OTP fuses; staged rollout and recovery path.
Details →The update path is the first thing an assessor tests, and the first thing an attacker looks for. It is built as one chain, not as a feature bolted onto an existing updater.
Root of trust pinned to what the silicon already has: boot ROM, OTP fuses, TPM 2.0 or a secure element. Measured boot with a signed event log where available, plus the factory provisioning procedure.
Details →Secure boot is a decision about which key the device trusts before any of your code runs. On most shipped hardware that decision is already made by the silicon — the work is using it correctly instead of adding a second, weaker check on top.
Boot chain, update path, key and credential storage, debug and recovery interfaces (JTAG, UART console, factory and service modes), update server authentication. Every finding carries the evidence.
Details →A review of the image that ships, not of the source you wish you had. It works on a firmware binary and a device, so it applies to products with third-party components and to code written years ago by someone who has left.
SBOM generated at build time in SPDX or CycloneDX and stored with the released artifact; dependency monitoring mapped to the versions actually shipped; triage and a rehearsed 24-hour reporting path.
Details →The requirement is not "have an SBOM". It is: given a CVE published this morning, know within the hour whether it affects a release you shipped three years ago, and be able to say so to a customer and to a regulator.
security.txt that a researcher can actually find.Architecture and data flow, requirement-to-artefact mapping, test records, and the rationale wherever a requirement is not applicable. Written so an assessor can test the claim without us in the room.
Details →The technical documentation is where a good product and a compliant product diverge. It has to be readable by an assessor who will try to falsify each claim, and it has to still make sense at the five-year support date.
Where the boot ROM verifies a signature, a signed update path can be added to hardware already in the field without a board revision. Where it cannot, we say so at scope time.
Details →Most products that need this were designed before anyone asked. The question is whether the existing hardware can be brought up to a defensible update path, or whether the honest answer is a board change.
If the part cannot verify anything at boot and the flash is readable, we say that in the first week and price the alternatives: a board revision, an external secure element, or a compensating control with the residual risk written down. A review that ends in "you cannot fix this" is still worth more than a report claiming otherwise.
You ship a connected device or an embedded system and someone has now asked you for an SBOM, an update policy and a vulnerability process. We build the technical part and leave you the file that proves it.
You assess radio equipment or products with digital elements and the file arrives with firmware claims nobody on the team can test. We take that section, under your procedure and your template.
You sell the compliance project and need an engineering answer for the parts that are not legal questions. Fixed-price line items, your client relationship, our name absent from the report.
For an assessment body or consultancy that has the file but needs the firmware section tested, not rewritten. We work on the image the manufacturer already holds — a build image, an OTA package, a vendor portal download — so nothing has to be unscrewed. Fixed price per device, ten business days from image to report, delivered under your brand.
A 25 MB appliance image we build ourselves, audited on 24.11.2026 with syft 1.57.2 and grype 0.122.1 against the Alpine advisory feed:
Read the sample extract (PDF, 3 pages) — image hash, tool output, one finding expanded with its evidence, and the list of what we did not check.
If you resell it, the client sees your document, your contact and your price. We are named in the NDA and in nothing else. Ask for a partner scope.
No. It answers "what is inside", which is necessary and is what most teams start with. The requirement is the handling process around it: who watches for a new CVE, how you decide whether your release is affected, who starts the 24-hour clock, and who writes the report. An SBOM without that process is a file nobody opens.
On hardware whose boot ROM already verifies a signature and where a spare slot exists, four to six weeks including the test record. Without a spare slot, or with a production line that has to change its provisioning station, add two to three weeks. If the silicon cannot verify anything at boot, the honest answer is a hardware change, and that is a different project.
No, and it is the common case. The reporting duty covers products already on the market, including those placed before December 2027. What changes is the starting point: an existing fleet with no update path is a different engagement from a new design, and the first deliverable is usually a decision on whether the current hardware can be retrofitted.
Yes to both. Work is delivered under the partner's documentation template, with our name absent from the client-facing report. White-label, fixed scope, 14-day payment from the partner, no exclusivity unless it comes with a volume commitment.
Firmware review of a single product: quoted per product after the scope call, typically a few days of work. Signed update path: fixed price per platform, agreed before anything starts. Vulnerability handling and reporting readiness: priced as a package with the rehearsal included. The first conversation is a scope call, not a sales call, and it ends with a number or with "this is not our work".
One problem, one hour-block, a fixed rate. Three answers decide whether a call is worth booking. Open the form, fill it, and the button writes the email — nothing is sent to a server.
Name, company, and whether you are the manufacturer, the partner, or the assessor. It changes what I can say about your product.
Open form →What does not work, what you already checked, and when it started. A symptom I can reproduce is worth more than an architecture diagram.
Open form →An outcome, not a topic: a yes/no decision, a list of steps, a risk call, or a second opinion on a report you already have.
Open form →650 PLN per hour, four-hour minimum, paid in full before the call; a receipt follows the confirmation. If the problem is bigger than a call, the reply names the engagement instead.
Product, silicon, and whether an update path already exists. That is enough for a scope and a price, usually within two working days.